Restoration
Engine room :: Wheelhouse :: On deck :: Hull :: Other :: Volunteering
Engine room :: Wheelhouse :: On deck :: Hull :: Other :: Volunteering
| Project | Status | Notes |
| Repaint from water line to weather deck | 2002 | Requires epoxy paint and no wake |
| Ventilation system for afterpeak | 2002 | |
| Haul, repaint and check zincs | 2002 | |
| Rebuild screws | Long term | Augments speed |
| Remove aft fuel tank & repair frames | Major project: within three years |
Site designed by Eric Weisler
home page | 9/11 story | about us | awards | calendar | contact us | history | press | photos
related sites | restoration | shop | thanks to | volunteering | wish list | save our ships ny
related sites | restoration | shop | thanks to | volunteering | wish list | save our ships ny
All material herein Copyright © 1999 - 2010 John J. Harvey, Ltd
John J. Harvey is a trademark of John J. Harvey Ltd. All rights reserved. Unauthorized use is strictly prohibited.
John J. Harvey is a trademark of John J. Harvey Ltd. All rights reserved. Unauthorized use is strictly prohibited.




