Line Drawing
Home Page
  About Harvey  
Make a Donation
     Contact Us     
Events Calendar
  Proud History  
      9/11 Story      
Harvey's Press
     ~ Awards ~     
    Restoration    
         Shop         
      Wish List      
    Volunteering    
   Photo Gallery   
    Thanks To    
   Related Sites   

Search our site 
National Register of Historic Places
National Trust for Historic Preservation Award
Try our quiz


Restoration

Engine room :: Wheelhouse :: On deck :: Hull :: Other :: Volunteering


Aside from nonstop chipping and painting, the biggest restoration project on deck was repairing the deck guns that had become stiff and rigid to operation from lack of use. The guns were cleaned, lubed and repacked. Then missing handles and bolts were replaced.

Augment night display lighting2002 
Deck lights2002 
Install missing name board2002Acquired from FDNY in 2001
Permanent canopy2002Guardia to design; Krevey to build pro-bono
Repaint & install crosses on stack2002Acquired from FDNY in 2001
Scrape & paint top down2002 
Wire railingsDone 2002USCG item
Add new benchesDone 2001 
Install and polish name boardsDone 2001 
Night display lightingDone 2001 
PFD's labeled & storedDone 2001USCG item
Repaint as required2002Done 2001

Site designed by
Eric Weisler

home page :: about Harvey :: save our ships ny :: contact us :: events calendar
proud history :: Harvey's press :: awards :: restoration :: wish list :: volunteering
photo gallery :: 9/11 story :: thanks to :: related sites

All material herein Copyright © 1999 - 2008 John J. Harvey, Ltd
All rights reserved. Unauthorized use is strictly prohibited