![]() |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Restoration Engine room :: Wheelhouse :: On deck :: Hull :: Other :: Volunteering Aside from nonstop chipping and painting, the biggest restoration project on deck was repairing the deck guns that had become stiff and rigid to operation from lack of use. The guns were cleaned, lubed and repacked. Then missing handles and bolts were replaced.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Eric Weisler |
home page :: about Harvey :: save our ships ny :: contact us :: events calendar proud history :: Harvey's press :: awards :: restoration :: wish list :: volunteering photo gallery :: 9/11 story :: thanks to :: related sites All material herein Copyright © 1999 - 2008 John J. Harvey, Ltd All rights reserved. Unauthorized use is strictly prohibited |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||